Accès ouvert

Determining the optimal periodicity for preventive replacement of mechanical spare parts

Article scientifique 2016 Anglais

Résumé

The goal of this work is determining the periodicity t0 which the preventive maintenance will execute for minimizing the operation cost. This type of preventive change is very used in practice by industrial manufacturing. In this study, we choose the model of block replacement type1: A failed unit is replaced instantaneously at failure. The mathematical model used is based on the Weibull law with γ= 0. The results obtained are discussed according to the values of the parameters of the Weibull law β and η and of the costs of preventive maintenance and correctiveDOI: http://dx.doi.org/10.5755/j01.mech.22.2.12269

Citer ce document

Berrehal, R., Benissaad, S. (2016). Determining the optimal periodicity for preventive replacement of mechanical spare parts. https://doi.org/10.5755/j01.mech.22.2.12269

Accès au document

Voir sur le dépôt source

Ce document est hébergé sur son dépôt institutionnel d'origine.

Statistiques

Consultations : 2

Téléchargements : 0