Accès ouvert

Modeling AL-QARAQOUL Canal Before and After Rehabilitation Using HEC-RAS

Article scientifique 2023 Anglais

Résumé

Abstract The Egyptian Ministry of Water Resources and Irrigation launched in 2020 the national project to rehabilitate the canals network to rationalize the use of water resources to face the scarcity problems. The aim of study is to evaluate the impact of canal rehabilitation on the performance of irrigation water delivered laterally to Mesqas and longitudinally to the end of canal. Qaraqoul Canal at Al-Mallah Area, Alexandria, Egypt, was modelled using HEC-RAS to simulate water levels in the canal before and after rehabilitation using four discharge scenarios: 1.82, 3.7, 2.2, 7.87 m3/sec. The calibration before rehabilitation shows that HEC-RAS simulated water levels corresponding to a discharge of 2.2 m3/sec, were in a good agreement with the actual field measured water levels. HECRAS results demonstrated that rehabilitation hydraulically improved the efficiency and performance of water conveyed by the canal. On the other hand, second scenario can be considered as suitable to keep water to reach the canal downstream with minimum suitable discharge, providing the need of two emergency pumps at last two Mesqas. An ideal cross-section is also simulated using HEC-RAS which produced an efficient alternative with 40% less cost than the constructed alternative.

Citer ce document

Zahran, S., Gooda, E., maged, N. (2023). Modeling AL-QARAQOUL Canal Before and After Rehabilitation Using HEC-RAS. https://doi.org/10.21203/rs.3.rs-3371669/v1

Accès au document

Texte intégral en lecture en ligne, réservé aux abonnés SPHAERO et aux membres de l'institution. Se connecter

Voir l'article sur le site de la revue

Statistiques

Consultations : 1

Téléchargements : 0