Accès ouvert

CRITICAL REVIEW OF THE LEVELISED COST OF ENERGY METRIC

Article scientifique 2016 Anglais

Résumé

The purpose of this paper is to critically review the ‘levelised cost of energy’ metric used in electricity project development. This metric is widely used, because it is a simple metric to calculate the cost per unit of electricity for a given technology connected to the electricity network. However, it neglects certain key terms such as inflation, integration costs, and system costs. The implications of incorporating these additional costs would provide a more comprehensive metric for evaluating electricity generation projects, and for the system as a whole. It is therefore recommended to refine the metric for the South African context.

Citer ce document

Sklar-Chik, M., Brent, A., Kock, I. (2016). CRITICAL REVIEW OF THE LEVELISED COST OF ENERGY METRIC. https://doi.org/10.7166/27-4-1496

Accès au document

Ce lien n'est plus accessible actuellement. Contactez l'institution d'origine.

Statistiques

Consultations : 4

Téléchargements : 0